| |
| | | | | | |
|
| Projects and Studies | |||
|
Tower Area 115 kV Transmission Project Great River Energy serves customers in the Vermilion Lake area, Tower, Ely, Winton, Babbitt, and the surrounding rural areas. Based on historic and projected load growth rates, the existing 46 kV transmission system will not be adequate to maintain acceptable voltage levels, which may jeopardize power delivery in these areas.
Tower Fact sheet (pdf file) Tower Certificate of Need (pdf file) Order certifying need from Minnesota Public Utilities Commission (pdf file) Please contact us for more information about this project. | |||