|
Great River Energy initiated an Environmental Assessment for the proposed Cambridge Station project on January 31, 2005.
Alternatives evaluation and site selection study for the construction of Cambridge Peaking Plant April 2005 (PDF)
Environmental Assessment for Cambridge Station
Because of the document’s size, all of the figures and attachments are broken into separate PDF files for easier downloading.
Environmental Assessment for Cambridge Station (PDF)
Figure 1-1 (PDF)
Figure 1-2 (PDF)
Figure 1-3 (PDF)
Figure 2-1 (PDF)
Figure 2-2 (PDF)
Figure 3-1 (PDF)
Figure 3-2 (PDF)
Figure 3-3 (PDF)
Figure 4-1 (PDF)
Figure 4-2 (PDF)
Figure 4-3 (PDF)
Figure 5-1 (PDF)
Figure 5-2 (PDF)
Figure 5-3 (PDF)
Figure 5-4 (PDF)
Figure 5-5 (PDF)
Figure 5-6 (PDF)
Figure 5-7 (PDF)
Figure 5-8 (PDF)
Figure 5-9 (PDF)
Figure 5-10 (PDF)
Figure 5-11 (PDF)
Figure 5-12 (PDF)
Figure 5-13 (PDF)
Figure 5-14 (PDF)
Figure 5-15 (PDF)
Figure 5-16 (PDF)
Figure 5-17 (PDF)
Figure 5-18 (PDF)
Figure A (PDF)
Figure B (PDF)
Figure C (PDF)
Figure D (PDF)
Figure E (PDF)
Figure F (PDF)
Figure G (PDF)
Figure H (PDF)
Figure I (PDF)
References (PDF)
Appendices (PDF)
|