Power Plants
We keep the lights on for Minnesota
Cambridge Station Project

Map

Announcements

Frequently Asked Questions

Site Application

Certificate of Need

Environmental Assessment

Great River Energy initiated an Environmental Assessment for the proposed Cambridge Station project on January 31, 2005.

Alternatives evaluation and site selection study for the construction of Cambridge Peaking Plant April 2005 (PDF)

Environmental Assessment for Cambridge Station

Because of the document’s size, all of the figures and attachments are broken into separate PDF files for easier downloading.

Environmental Assessment for Cambridge Station (PDF)

Figure 1-1 (PDF)

Figure 1-2 (PDF)

Figure 1-3 (PDF)

Figure 2-1 (PDF)

Figure 2-2 (PDF)

Figure 3-1 (PDF)

Figure 3-2 (PDF)

Figure 3-3 (PDF)

Figure 4-1 (PDF)

Figure 4-2 (PDF)

Figure 4-3 (PDF)

Figure 5-1 (PDF)

Figure 5-2 (PDF)

Figure 5-3 (PDF)

Figure 5-4 (PDF)

Figure 5-5 (PDF)

Figure 5-6 (PDF)

Figure 5-7 (PDF)

Figure 5-8 (PDF)

Figure 5-9 (PDF)

Figure 5-10 (PDF)

Figure 5-11 (PDF)

Figure 5-12 (PDF)

Figure 5-13 (PDF)

Figure 5-14 (PDF)

Figure 5-15 (PDF)

Figure 5-16 (PDF)

Figure 5-17 (PDF)

Figure 5-18 (PDF)

Figure A (PDF)

Figure B (PDF)

Figure C (PDF)

Figure D (PDF)

Figure E (PDF)

Figure F (PDF)

Figure G (PDF)

Figure H (PDF)

Figure I (PDF)

References (PDF)

Appendices (PDF)